Notes from the floor.
Practical pieces on the problems that come up in every job shop: quoting dates that hold, costing that tells the truth, and knowing where the work actually is.
Quoting
How to quote lead times you can actually hit
Most shops quote lead time from habit rather than capacity. A practical method for quoting dates the floor can hold, using scheduling data the ERP already holds.
9 min read
Job costingWhy your ERP says a job made money when it did not
Job costing reports in most shops are wrong in predictable ways. The five causes, how to tell which apply, and what accurate job costing changes about quoting.
8 min read
Shop floorKnowing what every machine is running right now
Why walking the floor is not visibility, what live job status actually requires, and how to get it from an ERP without replacing anything.
8 min read
Request a demo
Starts with a conversation. No charge, no obligation, and no sales call dressed up as a demo.